Smart Tech Industrial Park
Designed for Industry, Connected to the World
Empowering Productions at the Heart of Northern Malaysia’s Industrial Growth
Project Information
- 2
- 10500 SQ.FT
- 17652 SQ.FT - 35069 SQ.FT
KULIM HIGH TECH PARK
Discover Kulim Smart-Tech Industrial Park, an industrial development designed for forward-thinking businesses. Strategically positioned adjacent to Kulim Hi-Tech Park (Phase 3), this 37-acre park offers unparalleled access to vital trade routes and infrastructure.
Located just 3 minutes from the BKE Highway and only 21 minutes from Penang Port, the park connects you to global markets with ease, making it one of the most desirable industrial locations in the northern region of Malaysia.
- 2
- 10500 SQ.FT
- 17652 SQ.FT - 35069 SQ.FT
Kulim Smart-Tech Industrial Park
| Location : | Taman Waja Indah, Kulim Hi-Tech |
| Land Area : | Approximately 149,734 Sq.m. |
| Project Type : | Industrial Building |
| Total Unit : | 34 |
| Completion : | 2025 |
| Developer info : | Beaver Properties Group |
| Status : | Constructing |
OFFICE
Beaver Midtown Kulim offers a secure, convenient, and future-ready car park facility designed for both business tenants and visitors. With ample parking bays, 24/7 CCTV
surveillance, smart entry systems, EV charging stations, and direct access to retail and office spaces, our car park ensures a seamless experience in the heart of Kulim’s premier commercial hub. Whether you’re here for work or leisure, parking at Beaver Midtown is safe, accessible, and stress-free.
PRODUCTION AREA
The production area is the core manufacturing zone where raw materials are processed into finished goods, typically organized into sections for material staging, machining, assembly, quality control, and packaging. It requires heavy duty flooring, sufficient clear height, proper power and air supply, ventilation, and adequate lighting to support machinery and worker efficiency. Safety measures like fire protection, emergency exits, noise and dust control, and ergonomic design are essential, while specialized spaces such as machine shops, coating booths, and QC labs ensure smooth and compliant operations.
Expected completion date : 2027 44%
Overall progress is satisfactory with ongoing building works on site.
Structural Work
70%
- Structural work is completed.
Systems installation
25%
- Installation of electrical systems is completed.
Architectural Work
38%
- Architectural work is completed.
Plan & Layout
Select
GF Factory
- GF Factory
- 1st Factory
- Roof Factory



Property Location
Lot 70561, Tempat Tok Kong, Bandar, 09000 Kulim, Kedah